Concrete Volume Calculator

Calculate concrete volume and material costs for construction projects

Calculate Concrete Volume

How to Use the Concrete Calculator

Getting Started

  • Select Type: Choose between slab/beam, circular column, or footing
  • Choose Units: Select feet or meters for all measurements
  • Enter Dimensions: Input accurate measurements for precise calculations
  • Calculate: Click "Calculate Volume" to get results

Calculation Types

  • Slab/Beam: Rectangular volume = Length × Width × Thickness
  • Circular Column: Cylindrical volume = π × (Diameter/2)² × Height
  • Footing: Rectangular volume = Length × Width × Depth

Material Estimates

  • 80lb Bags: Approximately 45 bags per cubic yard
  • 60lb Bags: Approximately 60 bags per cubic yard
  • Ready-Mix: Truck capacity varies (6-9 cubic meters typical)

Professional Tips

  • Waste Factor: Add 10% extra for waste and spillage
  • Delivery: Factor in delivery costs for ready-mix concrete
  • Weather: Plan for weather conditions affecting concrete work
  • Curing: Consider curing time and conditions for optimal strength

Frequently Asked Questions

How much concrete do I need for a 10x10 slab?

For a 10×10 foot slab that's 4 inches thick, you'll need approximately 1.23 cubic yards of concrete. This equals about 55 bags of 80lb concrete mix.

What's the difference between 60lb and 80lb concrete bags?

80lb bags contain more concrete mix, requiring fewer bags overall. 60lb bags are easier to handle but you'll need more of them. Choose based on your physical capability and project size.

How do I calculate concrete for a round column?

Use the formula: Volume = π × (diameter/2)² × height. Our calculator handles this automatically when you select "Circular Column".

Should I order ready-mix or bag concrete?

Ready-mix is more cost-effective for projects over 1 cubic yard. Bags are better for small projects, repairs, or when access is limited.

How much extra concrete should I order?

Add 10% for waste and spillage. For large projects, 5-7% may be sufficient. It's better to have slightly more than to run short during the pour.